§ 2462. Notice and failure to make required connection.
An owner shall be given at least 45 days' notice of any ordinance requiring a water connection, and, upon failure of the owner to make the required connection, the borough may make the connection and collect the cost from the owner by a municipal claim or in an action of assumpsit. All connections required shall be uniform.
Section: Previous 2442 2443 2444 2451 2452 2453 2454 2455 2456 2457 2458 2461 2462 2463 NextLast modified: October 8, 2016