          design.17  The licensee event report indicates that the design of           
          the valves will be upgraded to ensure that each valve meets the             
          final safety analysis report.  An FPL engineering study, issued             
          in July 1985, “recommended that design modifications be                     
          implemented on an expedited basis” and that continued operation             
          was warranted.                                                              
               A 1987 BI No. 155 includes, inter alia, Main Stream                    
          Isolation.  The budget item contains an October 13, 1986, date              
          underneath “APPROVED BY - CORPORATE OFFICER”.  FPL issued an                
          expenditure requisition (ER)18 No. 4573 to “Install a low                   
          pressure air accumulator system”.  The ER also states:  “This               
          emergency ER is being prepared due to the length of time it takes           
          to obtain ER approval.  The work is currently scheduled for the             
          1988 Refueling Outage.  We anticipate this ER to be revised by              
          October 1988.”  The earliest date on the ER is October 1, 1988,             


               17 Mr. Bible testified that in the licensee event report,              
          FPL committed to the NRC to resolve the valve problem.                      
               18 Richard Engstrom, FPL’s supervisor of power plant                   
          accounting, testified as to the distinction between an ER and a             
          work order as follows:                                                      
               A work order is basically * * * issued to capture and                  
               record costs associated with a specific project at a                   
               specific location.  An ER which stands for expenditure                 
               requisition, it basically identifies the type of work                  
               order such as a transmission work order, distribution                  
               work order, a specific work order.  However, sometimes                 
               they are used interchangeably, particularly when it                    
               comes to a specific work order.                                        
               * * *                                                                  