Sec. 2206.151. TIME FOR CREATION OF PLAN OF OPERATION. (a) Not later than the 30th day after the date the temporary board of a pool is selected, the temporary board shall meet and begin preparing a detailed plan of operation for the pool.
(b) The temporary board shall complete the plan of operation not later than the 90th day after the date the temporary board is selected.
Added by Acts 2005, 79th Leg., Ch. 727 (H.B. 2017), Sec. 2, eff. April 1, 2007.
Section: Previous 2206.002 2206.051 2206.052 2206.053 2206.101 2206.102 2206.103 2206.151 2206.152 2206.201 2206.202 2206.203 2206.204 2206.205 2206.251 NextLast modified: September 28, 2016