Sec. 2208.151. TIME FOR CREATION OF PLAN OF OPERATION. Not later than the 30th day after the date the pool is created, the board shall meet to prepare a detailed plan of operation for the pool.
Added by Acts 2005, 79th Leg., Ch. 727 (H.B. 2017), Sec. 2, eff. April 1, 2007.
Section: Previous 2208.051 2208.052 2208.101 2208.102 2208.103 2208.104 2208.105 2208.151 2208.152 2208.201 2208.202 2208.203 2208.204 2208.205 2208.206 NextLast modified: September 28, 2016