Sec. 113.353. REQUIREMENTS OF TEST. (a) The school district shall perform the leakage test to determine whether the LP-gas piping system holds at least the amount of pressure specified by the commission.
(b) The leakage test must be conducted in accordance with commission rules.
(c) At the request of a school district, the commission shall assist the district in providing for the certification of an employee of the school district or school, as applicable, to conduct the test and in developing a procedure for conducting the test.
Added by Acts 2001, 77th Leg., ch. 1233, Sec. 53, eff. Sept. 1, 2001.
Amended by:
Acts 2009, 81st Leg., R.S., Ch. 995 (H.B. 3918), Sec. 2, eff. June 19, 2009.
Section: Previous 113.284 113.285 113.286 113.287 113.288 113.289 113.290 113.301 113.351 113.352 113.353 113.354 113.355 113.356 113.357 NextLast modified: September 28, 2016