Texas Natural Resources Code § 87.092 Permit Required

Sec. 87.092. PERMIT REQUIRED. In any common reservoir in this state producing both sweet and sour gas, no person may operate a plant for the extraction of the natural gasoline content of gas in which sweet gas and sour gas are commingled, or plant casinghead gas is commingled with either sweet gas or sour gas or both, until the person secures from the commission a permit authorizing the operation of the plant.

Acts 1977, 65th Leg., p. 2543, ch. 871, art. I, Sec. 1, eff. Sept. 1, 1977.

Section: Previous  87.013  87.014  87.051  87.052  87.053  87.054  87.091  87.092  87.093  87.094  87.095  87.096  87.097  87.131  87.132  Next

Last modified: September 28, 2016