Sec. 8820.202. LIMITATION ON ASSESSMENT OF PRODUCTION FEES. A production fee assessed by the district on the amount of groundwater authorized by a permit to be withdrawn from a well or the amount of groundwater actually withdrawn may not exceed:
(1) $1 for each acre-foot of groundwater permitted for or used in a year solely for agricultural use; or
(2) 20 cents for each 1,000 gallons of groundwater permitted for or used in a year for any purpose other than agriculture.
Added by Acts 2011, 82nd Leg., R.S., Ch. 357 (H.B. 3818), Sec. 1, eff. June 17, 2011.
Section: Previous 8820.001 8820.002 8820.003 8820.004 8820.051 8820.052 8820.053 8820.101 8820.102 8820.151 8820.152 8820.153 8820.201Last modified: September 28, 2016