Texas Transportation Code § 225.0401 El Camino East/west Corridor

Sec. 225.0401. EL CAMINO EAST/WEST CORRIDOR. (a) The parts of State Highways 7, 21, and 103, United States Highway 290, and Interstate Highway 10 that create a route from the Pendleton Bridge in Sabine County to the El Paso-Hudspeth County line are designated as the El Camino East/West Corridor.

(b) The part of Interstate Highway 10 that follows the route of the El Camino Real de Tierra Adentro in El Paso County is designated as the El Camino Real de Tierra Adentro East/West Corridor.

(c) To the extent the El Camino East/West Commission reimburses the department for the department's costs, the department shall:

(1) design and construct markers in consultation with the El Camino East/West Commission to be placed along the corridor indicating the highway number, the appropriate designation, and any other appropriate information; and

(2) erect a marker at each end of the corridor and at appropriate intermediate sites along the corridor.

(d) Funds collected by the department under Subsection (c) shall be deposited to the credit of the state highway fund.

Added by Acts 2005, 79th Leg., Ch. 937 (H.B. 747), Sec. 1, eff. September 1, 2005.

Section: Previous  225.035  225.036  225.037  225.038  225.039  225.0395  225.040  225.0401  225.0402  225.041  225.042  225.043  225.044  225.045  225.046  Next

Last modified: September 28, 2016