Sec. 363.003. DUTY TO REPAIR; FORFEIT OF TOLLS. (a) The contractor shall maintain the bridge during the term of the contract.
(b) A contractor who fails to maintain the bridge forfeits all right to the tolls.
Acts 1995, 74th Leg., ch. 165, Sec. 1, eff. Sept. 1, 1995.
Section: Previous 363.001 363.002 363.003 363.004 NextLast modified: September 28, 2016