Texas Utilities Code § 43.054 No Additional Easements Or Consideration Required

Sec. 43.054. NO ADDITIONAL EASEMENTS OR CONSIDERATION REQUIRED. Because BPL systems provide benefits to electric delivery systems, the installation of a BPL system on an electric delivery system shall not require the electric utility or the owner of the BPL system or an entity defined in Section 11.003(9) to obtain or expand easements or other rights-of-way for the BPL system or to give additional consideration as a result of the installation or the operation of a BPL system. For purposes of this section, installation of a BPL system shall be deemed to be consistent with installation of an electric delivery system.

Added by Acts 2005, 79th Leg., 2nd C.S., Ch. 2 (S.B. 5), Sec. 2, eff. September 7, 2005.