Sec. 31.003. PERMIT FROM COMMISSION. A person desiring to drill, excavate, or otherwise construct a subsurface excavation may not begin construction without first obtaining a permit for the work from the commission.
Added by Acts 1989, 71st Leg., ch. 2, Sec. 15.02(a), eff. Aug. 28, 1989.
Section: Previous 31.001 31.002 31.003 31.004 31.005 31.006 31.007 31.008 31.009 31.010 31.011 31.012 31.013 31.014 31.015 NextLast modified: September 28, 2016