Texas Water Code § 5.5145 Emergency Order Concerning Operation Of Rock Crusher Or Concrete Plant Without Permit

Sec. 5.5145. EMERGENCY ORDER CONCERNING OPERATION OF ROCK CRUSHER OR CONCRETE PLANT WITHOUT PERMIT. The commission may issue an emergency order under this subchapter suspending operations of a rock crusher or a concrete plant that performs wet batching, dry batching, or central mixing and is required to obtain a permit under Section 382.0518, Health and Safety Code, and is operating without the necessary permit.

Added by Acts 2001, 77th Leg., ch. 965, Sec. 5.08(a), eff. Sept. 1, 2001 and Acts 2001, 77th Leg., ch. 1271, Sec. 1, eff. Sept. 1, 2001.

Amended by:

Acts 2011, 82nd Leg., R.S., Ch. 1072 (S.B. 1003), Sec. 2, eff. June 17, 2011.

Section: Previous  5.507  5.509  5.510  5.511  5.512  5.513  5.514  5.5145  5.5146  5.515  5.516  5.551  5.552  5.553  5.554  Next

Last modified: September 28, 2016