(a)
(2) To address the requirements under paragraph (1), each installation master plan shall include consideration of—
(A) planning for compact and infill development;
(B) horizontal and vertical mixed-use development;
(C) the full lifecycle costs of real property planning decisions; and
(D) capacity planning through the establishment of growth boundaries around cantonment areas to focus development towards the core and preserve range and training space.
(b)
(2) To address the requirements under subsection (a) and paragraph (1), each installation master plan shall include consideration of ways to diversify and connect transit systems.
(c)
(d)
(1) The term "major military installation" has the meaning given to the term "large site" in the most recent version of the Department of Defense Base Structure Report issued before the time interval prescribed for development of installation master plans arises under subsection (a).
(2) The terms "metropolitan planning area" and "metropolitan planning organization" have the meanings given those terms in section 134(b) of title 23 and section 5303(b) of title 49.
(Added Pub. L. 112–239, div. B, title XXVIII, §2802(a), Jan. 2, 2013, 126 Stat. 2147; amended Pub. L. 113–66, div. B, title XXVIII, §2811, Dec. 26, 2013, 127 Stat. 1013.)
Sections: Previous 2856 2858 2859 2860 2861 2862 2863 2864 2866 2867 2868 2869 2871 2872 2872a Next
Last modified: October 26, 2015