16 USC 459g-5 - Shore Erosion Control or Beach Protection Measures

The authority of the Chief of Engineers, Department of the Army, to undertake or contribute to shore erosion control or beach protection measures within the Cape Lookout National Seashore shall be exercised in accordance with a plan that is mutually acceptable to the Secretary of the Interior and the Secretary of the Army, and that is consistent with the purposes of sections 459g to 459g–7 of this title.

(Pub. L. 89–366, §6, Mar. 10, 1966, 80 Stat. 35.)

Sections:  Previous  459f-10  459f-11  459g  459g-1  459g-2  459g-3  459g-4  459g-5  459g-6  459g-7  459h  459h-1  459h-2  459h-3  459h-4  Next

Last modified: October 26, 2015