For the purpose of improving navigation on the Columbia River, and for other purposes incidental thereto, the dam, locks, power plant, and appurtenant works under construction on August 20, 1937, at Bonneville, Oregon and North Bonneville, Washington (called Bonneville project in this chapter), shall be completed, maintained, and operated under the direction of the Secretary of the Army and the supervision of the Chief of Engineers, subject to the provisions of this chapter relating to the powers and duties of the Bonneville power administrator provided for in section 832a(a) of this title (called the administrator in this chapter) respecting the transmission and sale of electric energy generated at said project. The Secretary of the Army shall provide, construct, operate, maintain, and improve at Bonneville project such machinery, equipment, and facilities for the generation of electric energy as the administrator may deem necessary to develop such electric energy as rapidly as markets may be found therefor. The electric energy thus generated and not required for the operation of the dam and locks at such project and the navigation facilities employed in connection therewith shall be delivered to the administrator, for disposition as provided in this chapter.
(Aug. 20, 1937, ch. 720, §1, 50 Stat. 731; July 26, 1947, ch. 343, title II, §205(a), 61 Stat. 501.)
Sections: Previous 831y-1 831z 831aa 831bb 831cc 831dd 831ee 832 832a 832b 832c 832d 832e 832f 832g Next
Last modified: October 26, 2015