The Board may study, plan, design, engineer, and construct a photovoltaic system for the main roof of the John F. Kennedy Center for the Performing Arts.
Not later than 60 days before beginning construction of the photovoltaic system pursuant to subsection (a), the Board shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the feasibility and design of the project.
(Pub. L. 85–874, §7, as added, Pub. L. 110–338, §3, Oct. 3, 2008, 122 Stat. 3731.)
Sections: Previous 76f 76g 76h 76i 76j 76k 76l 76m 76o 76p 76q 76q-1 76r 76s 76aa Next
Last modified: October 26, 2015