The Secretary, in cooperation with the Chino Basin Watermaster, the Inland Empire Utilities Agency, and the Santa Ana Watershed Project Authority and acting under the Federal reclamation laws, shall participate in the design, planning, and construction of the Lower Chino Dairy Area desalination demonstration and reclamation project.
The Federal share of the cost of the project described in subsection (a) shall not exceed—
(1) 25 percent of the total cost of the project; or
(2) $26,000,000.
Funds provided by the Secretary shall not be used for operation or maintenance of the project described in subsection (a).
There are authorized to be appropriated such sums as are necessary to carry out this section.
This section shall have no effect after the date that is 10 years after March 30, 2009.
(Pub. L. 102–575, title XVI, §1653, as added Pub. L. 111–11, title IX, §9111(b)(1), Mar. 30, 2009, 123 Stat. 1317.)
Sections: Previous 390h-29 390h-30 390h-31 390h-32 390h-33 390h-34 390h-35 390h-36 390h-37 390h-38 390h-39 390aa 390bb 390cc 390dd Next
Last modified: October 26, 2015