378

DOLAN v. CITY OF TIGARD

Opinion of the Court

congestion in the Central Business District as a particular problem, the city adopted a plan for a pedestrian/ bicycle pathway intended to encourage alternatives to automobile transportation for short trips. The CDC requires that new development facilitate this plan by dedicating land for pedestrian pathways where provided for in the pedestrian/ bicycle pathway plan.1

The city also adopted a Master Drainage Plan (Drainage Plan). The Drainage Plan noted that flooding occurred in several areas along Fanno Creek, including areas near petitioner's property. Record, Doc. No. F, ch. 2, pp. 2-5 to 2-8; 4-2 to 4-6; Figure 4-1. The Drainage Plan also established that the increase in impervious surfaces associated with continued urbanization would exacerbate these flooding problems. To combat these risks, the Drainage Plan suggested a series of improvements to the Fanno Creek Basin, including channel excavation in the area next to petitioner's property. App. to Pet. for Cert. G-13, G-38. Other recommendations included ensuring that the floodplain remains free of structures and that it be preserved as greenways to minimize flood damage to structures. Record, Doc. No. F, ch. 5, pp. 5-16 to 5-21. The Drainage Plan concluded that the cost of these improvements should be shared based on both direct and indirect benefits, with property owners along the waterways paying more due to the direct benefit that they would receive. Id., ch. 8, p. 8-11. CDC Chapters 18.84 and 18.86

1 CDC § 18.86.040.A.1.b provides: "The development shall facilitate pedestrian/ bicycle circulation if the site is located on a street with designated bikepaths or adjacent to a designated greenway/open space/park. Specific items to be addressed [include]: (i) Provision of efficient, convenient and continuous pedestrian and bicycle transit circulation systems, linking developments by requiring dedication and construction of pedestrian and bikepaths identified in the comprehensive plan. If direct connections cannot be made, require that funds in the amount of the construction cost be deposited into an account for the purpose of constructing paths." App. to Brief for Respondent B-33 to B-34.

Page:   Index   Previous  1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  Next

Last modified: October 4, 2007