§ 10.1-603.2:2. Permits
A. It shall be unlawful to cause a stormwater discharge from an MS4 or a land disturbing activity except in compliance with a permit issued by a permit issuing authority.
B. All permits issued by the permit issuing authority under this article shall have fixed terms. The term of a permit shall be based upon the projected duration of the project, the length of any required monitoring, or other project operations or permit conditions; however, the term shall not exceed five years. The term of a permit issued by the permit issuing authority shall not be extended by modification beyond the maximum duration and the permit shall expire at the end of the term unless an application for a new permit has been filed in a timely manner as required by the regulations of the Board, and the permit issuing authority is unable, through no fault of the permittee, to issue a new permit before the expiration date of the previous permit.
(2004, c. 372; 2006, c. 171.)
Sections: Previous 10.1-600 10.1-601 10.1-602 10.1-603 10.1-603.1 10.1-603.2 10.1-603.2:1 10.1-603.2:2 10.1-603.3 10.1-603.4 10.1-603.4:1 10.1-603.5 10.1-603.6 10.1-603.7 10.1-603.8 NextLast modified: April 2, 2009