§ 10.1-619. Consideration of results of referendum; simple majority vote required
The results of the referendum shall be considered by the district directors in determining whether the operation of the proposed watershed improvement district is administratively practicable and feasible. The district directors shall not be authorized to determine that operation of the proposed watershed improvement district is administratively practicable and feasible unless a simple majority of the votes cast in the referendum have been cast in favor of the creation of the watershed improvement district.
(1956, c. 668, § 21-112.5; 1970, c. 480; 1977, c. 40; 1988, c. 891; 2005, c. 128.)
Sections: Previous 10.1-613.4 10.1-613.5 10.1-614 10.1-615 10.1-616 10.1-617 10.1-618 10.1-619 10.1-620 10.1-621 10.1-622 10.1-623 10.1-624 10.1-625 10.1-626 NextLast modified: April 2, 2009