§ 33.1-180. When larger spillway required

In case the earthen portion of a dam has been washed away and it is determined by the Commissioner that the washout was caused by a spillway of insufficient opening to carry floodwater, the dam shall not be restored for the purpose of impounding water unless the owner or occupier agrees with the Commissioner for the construction of a spillway with adequate opening, conforming to plans and specifications of the Department of Transportation. In the event that such construction is required, the Commissioner shall be responsible for such part of the cost as would be necessary to provide a bridge with sufficient opening to carry the floodwater of the stream and the owner or occupier of the dam shall be required to pay the difference in cost, if any, of providing adequate floodgates and spillways in addition to the bridge.

(Code 1950, § 33-94; 1970, c. 322.)

Sections:  Previous  33.1-173  33.1-174  33.1-175  33.1-176  33.1-177  33.1-178  33.1-179  33.1-180  33.1-181  33.1-182  33.1-183  33.1-183.1  33.1-184  33.1-185  33.1-186  Next

Last modified: April 3, 2009