§ 18.104.049. Modification of construction standards
The department by rule shall adopt procedures to permit a well operator to modify construction standards to meet unforeseen circumstances encountered during the construction of a well. The procedures shall be developed in consultation with the technical advisory group established in RCW 18.104.190.
[1993 c 387 § 7.]