§ 68.24.180. Opening of roads, railroads through cemetery -- Consent required
After dedication under this title, and as long as the property remains dedicated to cemetery purposes, a railroad, street, road, alley, pipe line, pole line, or other public thoroughfare or utility shall not be laid out, through, over, or across any part of it without the consent of the cemetery authority or of not less than two-thirds of the owners of plots or rights of interment.
[2005 c 365 § 84; 1994 c 273 § 20; 1984 c 7 § 369; 1959 c 217 § 1; 1947 c 69 § 1; 1943 c 247 § 69; Rem. Supp. 1947 § 3778-69.]
Notes:
Severability -- 1984 c 7: See note following RCW 47.01.141.
Sections: Previous 68.24.090 68.24.100 68.24.110 68.24.115 68.24.120 68.24.130 68.24.140 68.24.150 68.24.160 68.24.170 68.24.180 68.24.190 68.24.220 68.24.240 68.24.250 Next
Last modified: April 7, 2009