Revised Code of Washington - RCW Title 4 Civil Procedure - Section 4.16.320 Actions or claims arising from construction, alteration, repair, design, planning, survey, engineering, etc., of improvements upon real property -- Construction

§ 4.16.320. Actions or claims arising from construction, alteration, repair, design, planning, survey, engineering, etc., of improvements upon real property -- Construction

Nothing in RCW 4.16.300 through 4.16.320 shall be construed as extending the period now permitted by law for bringing any kind of action.

[1967 c 75 § 3.]

Sections:  Previous  4.16.250  4.16.260  4.16.270  4.16.280  4.16.290  4.16.300  4.16.310  4.16.320  4.16.325  4.16.326  4.16.327  4.16.340  4.16.350  4.16.360  4.16.370  Next

Last modified: April 7, 2009