§ 77.100.120. Cedar river spawning channel -- Specifications
The channel shall be designed to produce, at a minimum, fry comparable in quality to those produced in the Cedar river and equal in number to what could be produced naturally by the estimated two hundred sixty-two thousand adults that could have spawned upstream of the Landsburg diversion. Construction of the spawning channel shall commence no later than September 1, 1990. Initial construction size shall be adequate to produce fifty percent or more of the production goal specified in this section.
[1989 c 85 § 5. Formerly RCW 75.52.120.]
Notes:
Project designation -- Legislative finding -- Severability -- 1989 c 85: See notes following RCW 77.100.100.
Sections: Previous 77.100.040 77.100.050 77.100.060 77.100.070 77.100.080 77.100.090 77.100.100 77.100.110 77.100.120 77.100.130 77.100.140 77.100.150 77.100.160 77.100.170 77.100.900 Next
Last modified: April 7, 2009