§ 47.04.100. Temporary route pending construction of new highway -- Streets, roads not to be maintained as
Unless otherwise provided, whenever by statute a new highway or extension is added to the state highway system, no existing city street or county road may be maintained or improved by the department as a temporary route of such new highway or extension pending the construction of the new highway or extension on the location adopted by the department.
[1984 c 7 § 90; 1973 1st ex.s. c 151 § 12; 1965 ex.s. c 170 § 34.]
Notes:
Severability -- 1984 c 7: See note following RCW 47.01.141.
Sections: Previous 47.04.060 47.04.070 47.04.080 47.04.081 47.04.082 47.04.083 47.04.090 47.04.100 47.04.140 47.04.150 47.04.160 47.04.170 47.04.180 47.04.190 47.04.200 Next
Last modified: April 7, 2009