§ 79.73.010. Management and control
The portion of the Milwaukee Road corridor from the west end of the bridge structure over the Columbia river, which point is located in section 34, township 16 north, range 23 east, W.M., to the Idaho border purchased by the state shall be under the management and control of the department.
[2003 c 334 § 456; (2003 c 334 § 455; 2000 c 11 § 23; 1996 c 129 § 8 expired July 1, 2006); 1989 c 129 § 2; 1984 c 174 § 6. Formerly RCW 79.08.275.]
Notes:
Intent -- 2003 c 334: See note following RCW 79.02.010.
Construction -- 1989 c 129: See note following RCW 79A.05.315.
Purpose -- 1984 c 174: See note following RCW 79A.05.315.
Sections: 79.73.010 79.73.020 79.73.030 79.73.040 79.73.050 79.73.060 Next
Last modified: April 7, 2009