If any consumer to whom a meter has been furnished shall request the commission in writing to inspect such meter, the commission shall have the same inspected and tested, and if the same, on being so tested, shall be found to be more than four percent if an electric meter, or more than two percent if a gas meter, or more than two percent if a water meter, defective or incorrect to the prejudice of the consumer, the expense of such inspection and test shall be borne by the gas company, electrical company or water company, and if the same, on being so tested shall be found to be correct within the limits of error prescribed by the provisions of this section, the expense of such inspection and test shall be borne by the consumer.

[1961 c 14 § 80.28.170. Prior: 1911 c 117 § 74, part; RRS § 10410, part.]

Sections:  Previous  80.28.100  80.28.110  80.28.120  80.28.130  80.28.140  80.28.150  80.28.160  80.28.170  80.28.180  80.28.185  80.28.190  80.28.200  80.28.220  80.28.230  80.28.240  Next

Last modified: April 7, 2009