Revised Code of Washington - RCW Title 54 Public Utility Districts - Section 54.28.025 Tax imposed with respect to thermal electric generating facilities -- Rate -- Additional tax imposed

§ 54.28.025. Tax imposed with respect to thermal electric generating facilities -- Rate -- Additional tax imposed

(1) There is hereby levied and there shall be collected from every district operating a thermal electric generating facility, as defined in RCW 54.28.010 as now or hereafter amended, having a design capacity of two hundred fifty thousand kilowatts or more, located on a federal reservation, which is placed in operation after September 21, 1977, a tax for the act or privilege of engaging within the state in the business of generating electricity for use or sale, equal to one and one-half percent of wholesale value of energy produced for use or sale, except energy used in the operation of component parts of the power plant and associated transmission facilities under control of the person operating the power plant.

(2) An additional tax is imposed equal to the rate specified in RCW 82.02.030 multiplied by the tax payable under subsection (1) of this section.

[1983 2nd ex.s. c 3 § 9; 1982 1st ex.s. c 35 § 19; 1977 ex.s. c 366 § 6.]

Notes:
     Construction -- Severability -- Effective dates -- 1983 2nd ex.s. c 3: See notes following RCW 82.04.255.

     Severability -- Effective dates -- 1982 1st ex.s. c 35: See notes following RCW 82.08.020.

Sections:  Previous  54.28.010  54.28.011  54.28.020  54.28.025  54.28.030  54.28.040  54.28.050  54.28.055  54.28.060  54.28.070  54.28.080  54.28.090  54.28.100  54.28.110  54.28.120  Next

Last modified: April 7, 2009