Revised Code of Washington - RCW Title 43 State Government -- Executive - Section 43.21A.610 Steam electric generating plant -- Study -- Construction

§ 43.21A.610. Steam electric generating plant -- Study -- Construction

The director shall continue the study of the state power commission made in 1956 relating to the construction of a steam power electric generating plant, and if the construction of a steam electric generating plant is found to be feasible by the director, the director may construct such plant at a site determined by him to be feasible and operate it as a state owned facility.

[1988 c 127 § 10; 1965 c 8 § 43.21.250. Prior: 1957 c 275 § 3. Formerly RCW 43.21.250]

Sections:  Previous  43.21A.450  43.21A.470  43.21A.510  43.21A.515  43.21A.520  43.21A.600  43.21A.605  43.21A.610  43.21A.612  43.21A.614  43.21A.616  43.21A.618  43.21A.620  43.21A.622  43.21A.624  Next

Last modified: April 7, 2009