§ 81.53.100. Cost when railroad crosses highway
Whenever, under the provisions of this chapter, new railroads are constructed across existing highways, or highway changes are made either for the purpose of avoiding grade crossings on such new railroads, or for the purpose of crossing at a safer and more accessible point than otherwise available, the entire expense of crossing above or below the grade of the existing highway, or changing the route thereof, for the purpose mentioned in this section, shall be paid by the railroad company.
[1961 c 14 § 81.53.100. Prior: 1937 c 22 § 4A; 1925 ex.s. c 73 § 1A; 1921 c 138 § 2A; 1913 c 30 § 6A; RRS § 10516A. Formerly RCW 81.52.170.]
Sections: Previous 81.53.040 81.53.050 81.53.060 81.53.070 81.53.080 81.53.090 81.53.091 81.53.100 81.53.110 81.53.120 81.53.130 81.53.140 81.53.150 81.53.160 81.53.170 NextLast modified: April 7, 2009