§ 81.88.110. Pipeline company duties after notice of excavation
A pipeline company that has been notified by an excavator that excavation work will occur near a hazardous liquid pipeline shall ensure that the pipeline company's representative consults with the excavator on-site prior to the excavation. The pipeline company has the discretion to require that the pipeline section in the vicinity of the excavation is fully uncovered and examined for damage prior to being reburied.
[2000 c 191 § 21.]
Sections: Previous 81.88.020 81.88.030 81.88.040 81.88.050 81.88.060 81.88.065 81.88.070 81.88.080 81.88.090 81.88.100 81.88.110 81.88.140 81.88.900 81.88.901 81.88.902 NextLast modified: April 7, 2009