Ex parte PAGANI et al. - Page 6




          Appeal No. 95-2535                                                          
          Application 07/987,127                                                      

          having a higher efficiency yield than said first urea                       
          synthesis reactor;                                                          
               b) distributing an overall production capacity that                    
          exceeds that of said pre-existing plant to apportion from 60                
          to 95% of said overall capacity to said first urea synthesis                
          reactor and from 5 to 40% of said capacity to said second urea              
          synthesis reactor.                                                          

               The manipulative step recited in a) of claim 9 is                      
          "providing . . . a second urea synthesis reactor", which is                 
          consistent with the preamble indication that the claim is                   
          drawn to a method of "revamping an existing urea production                 
          plant."  This part of the claim includes a construction step                
          that results in a modified urea plant.                                      
               The manipulative step recited in b) of claim 9 is                      
          "distri-buting an overall production capacity" between the                  
          "first urea synthesis reactor", i.e., the pre-existing                      
          reactor, and the "second urea synthesis reactor", i.e., the                 
          reactor added in step a) of claim 9.  The step of                           
          "distributing capacity" presumes that reactants are being                   
          distributed between and transported to the two reactors.                    
          Thus, step b) presumes that urea is being synthesized and the               
          plant is operating.  Step b) appears to be inconsistent with                
          the preamble.  If the plant is operating, then a method of                  

                                          6                                           