Appeal No. 2000-0076 Application 08/970,231 place as a single module structure, or are coupled to other modules to yield a composite building” (column 1, lines 10 through 13). The plant includes a component preparation area 100, subsection fabrication areas 200, 300, 400 and 500, a final assembly site 600, overhead cranes OC for transporting elements from the component preparation area to the various subsection fabrication areas and then to the final assembly site, a concrete floor pouring station 800, a concrete curing station 810, a finishing area 900 composed of a variety of finishing stations 905-950, and transport means (e.g., casters) for sequentially moving the final assembly to the concrete floor pouring station, the curing station and the finishing stations. Like Biffis, Rizk fails to disclose subassembly production lines and an associated dwelling assembly alley as recited in claims 1, 27 and 39. Thus, Rizk does not overcome the above noted deficiencies of Biffis. The same is true of the Chief Industries brochures which are cited for their disclosures of knock-down building structures. 8Page: Previous 1 2 3 4 5 6 7 8 9 10 11 12 13 14 NextLast modified: November 3, 2007