Appeal No. 2005-2694 Application No. 10/208,631 providing the mesh tube to a location prone to storm-water flow. 114. A method for forming a sediment control device comprising: placing a compost-based filling into a mesh tube formed from a mesh material having a nominal opening size of less than 0.5 inches, a ratio of a length of the mesh tube to a diameter of the mesh tube greater than 40; and providing the mesh tub to a location prone to sediment-containing water flow. THE EVIDENCE The items relied on by the examiner as evidence of obviousness are: Grabhorn 5,595,458 Jan. 21, 1997 Burke 5,679,247 Oct. 21, 1997 Ito et al. (Ito) 5,747,633 May 05, 1998 Garcia et al. (Garcia) 5,854,304 Dec. 29, 1998 Albright Seed Company, “Construction Site Erosion Costly, Illegal” ©1997, 1998 (Albright). The item relied on by the appellant as evidence of non- obviousness is: The 37 CFR § 1.132 Declaration of Dr. Jerald S. Fifield filed July 28, 2004. THE REJECTIONS 3Page: Previous 1 2 3 4 5 6 7 8 9 10 11 12 13 NextLast modified: November 3, 2007