Ex Parte Rock - Page 2



             Appeal 2007-1474                                                                                  
             Application 10/192,833                                                                            
                                        SUMMARY OF DECISION                                                    
                   We REVERSE.                                                                                 

                                             THE INVENTION                                                     
                   Appellant’s claimed invention is to a method for selecting and designing                    
             drill bits for drilling boreholes so that petroleum fluid extraction from subsurface              
             formations is optimized (Specification 1:9-11).  Claims 1 and 6, reproduced below,                
             are representative of the subject matter on appeal.                                               
                          1.  A method for drilling a borehole through a production                            
                          zone underlying an overburden of various earth                                       
                          formations, the method comprising:                                                   
                                drilling the borehole through the overburden with                              
                          at least one drill bit selected to optimize at least one                             
                          drilling performance parameter; and                                                  
                                drilling the borehole through at least part of the                             
                          production zone with at least one other drill bit selected                           
                          to optimize at least one production performance                                      
                          parameter.                                                                           

                          6. A method for selecting parameters to optimize a                                   
                          production performance parameter in a drilled borehole,                              
                          comprising:                                                                          
                                selecting initial bit design parameters and initial                            
                          drilling operating parameters;                                                       
                                simulating drilling of a selected earth formation,                             
                          the simulating including determining at least one                                    
                          parameter related to production performance in the                                   
                          selected earth formation;                                                            

                                                      2                                                        



Page:  Previous  1  2  3  4  5  6  7  8  9  10  Next

Last modified: September 9, 2013