(220 ILCS 5/9-217) (from Ch. 111 2/3, par. 9-217)
Sec. 9-217. In each case or proceeding to determine the reasonableness of rates for any electric utility which involves the proposed inclusion of a significant new generation or production facility in rate base, the Commission may consider the adoption of a rate moderation plan which is designed to diminish the immediate rate impact of such proposed inclusion.
(Source: P.A. 84-617.)
Sections: Previous 9-211 9-212 9-213 9-214 9-215 9-215.1 9-216 9-217 9-220 9-220.1 9-220.2 9-220.3 9-221 9-222 9-222.1 Next
Last modified: February 18, 2015