13:1E-87. First date of approval of new facility; increase in capacity; approval
a. Prior to the adoption, pursuant to section 9 of this act, of the criteria for the siting of new major hazardous waste facilities, no registration statement or engineering design for any new major hazardous waste facility shall be approved by the department. Amendments to registration statements or engineering designs filed under section 5 of P.L.1970, c. 39 (C. 13:1E-5) for the expansion of existing major hazardous waste facilities may be granted by the department prior to such adoption, provided that, if the expansion would result in an increase of more than 50% of the capacity of the facility as of the effective date of this act, the review and approval of the application for such amendments shall be conducted in the manner provided in section 12 of this act.
b. Subsequent to the adoption, pursuant to section 9 of this act, of the criteria for the siting of new major hazardous waste facilities, the review and approval by the department of all amendments to registration statements or engineering designs which would result in an increase of more than 50% of the capacity of any major hazardous waste facility shall be conducted in the manner provided in section 12 of this act.
L.1981, c. 279, s. 39, eff. Sept. 10, 1981.
Section: Previous 13-1e-80 13-1e-81 13-1e-82 13-1e-83 13-1e-84 13-1e-85 13-1e-86 13-1e-87 13-1e-88 13-1e-89 13-1e-90 13-1e-91 13-1e-96 13-1e-96.1 13-1e-96.2 Next
Last modified: October 11, 2016