(1) As used in this section, “large school district” means a school district that has an enrollment of over 2,500 students based on certified enrollment numbers submitted to the Department of Education during the first quarter of each new school year.
(2) A city or county containing a large school district shall:
(a) Include as an element of its comprehensive plan a school facility plan prepared by the district in consultation with the affected city or county.
(b) Initiate planning activities with a school district to accomplish planning as required under ORS 195.020.
(3) The provisions of subsection (2)(a) of this section do not apply to a city or a county that contains less than 10 percent of the total population of the large school district.
(4) The large school district shall select a representative to meet and confer with a representative of the city or county, as described in subsection (2)(b) of this section, to accomplish the planning required by ORS 195.020 and shall notify the city or county of the selected representative. The city or county shall provide the facilities and set the time for the planning activities. The representatives shall meet at least twice each year, unless all representatives agree in writing to another schedule, and make a written summary of issues discussed and proposed actions.
(5)(a) The school facility plan must cover a period of at least 10 years and must include, but need not be limited to, the following elements:
(A) Population projections by school age group.
(B) Identification by the city or county and by the large school district of desirable school sites.
(C) Descriptions of physical improvements needed in existing schools to meet the minimum standards of the large school district.
(D) Financial plans to meet school facility needs, including an analysis of available tools to ensure facility needs are met.
(E) An analysis of:
(i) The alternatives to new school construction and major renovation; and
(ii) Measures to increase the efficient use of school sites including, but not limited to, multiple-story buildings and multipurpose use of sites.
(F) Ten-year capital improvement plans.
(G) Site acquisition schedules and programs.
(b) Based on the elements described in paragraph (a) of this subsection and applicable laws and rules, the school facility plan must also include an analysis of the land required for the 10-year period covered by the plan that is suitable, as a permitted or conditional use, for school facilities inside the urban growth boundary.
(6) If a large school district determines that there is an inadequate supply of suitable land for school facilities for the 10-year period covered by the school facility plan, the city or county, or both, and the large school district shall cooperate in identifying land for school facilities and take necessary actions, including, but not limited to, adopting appropriate zoning, aggregating existing lots or parcels in separate ownership, adding one or more sites designated for school facilities to an urban growth boundary, or petitioning a metropolitan service district to add one or more sites designated for school facilities to an urban growth boundary pursuant to applicable law.
(7) The school facility plan shall provide for the integration of existing city or county land dedication requirements with the needs of the large school district.
(8) The large school district shall:
(a) Identify in the school facility plan school facility needs based on population growth projections and land use designations contained in the city or county comprehensive plan; and
(b) Update the school facility plan during periodic review or more frequently by mutual agreement between the large school district and the affected city or county.
(9)(a) In the school facility plan, the district school board of a large school district may adopt objective criteria to be used by an affected city or county to determine whether adequate capacity exists to accommodate projected development. Before the adoption of the criteria, the large school district shall confer with the affected cities and counties and agree, to the extent possible, on the appropriate criteria. After a large school district formally adopts criteria for the capacity of school facilities, an affected city or county shall accept those criteria as its own for purposes of evaluating applications for a comprehensive plan amendment or for a residential land use regulation amendment.
(b) A city or county shall provide notice to an affected large school district when considering a plan or land use regulation amendment that significantly impacts school capacity. If the large school district requests, the city or county shall implement a coordinated process with the district to identify potential school sites and facilities to address the projected impacts.
(10) A school district that is not a large school district may adopt a school facility plan as described in this section in consultation with an affected city or county.
(11) The capacity of a school facility is not the basis for a development moratorium under ORS 197.505 to 197.540.
(12) This section does not confer any power to a school district to declare a building moratorium.
(13) A city or county may deny an application for residential development based on a lack of school capacity if:
(a) The issue is raised by the school district;
(b) The lack of school capacity is based on a school facility plan formally adopted under this section; and
(c) The city or county has considered options to address school capacity. [1993 c.550 §2; 1995 c.508 §1; 2001 c.876 §1; 2007 c.579 §1]
Note: Section 3, chapter 579, Oregon Laws 2007, provides:
Sec. 3. A school district that is a large school district as defined in ORS 195.110 on the effective date of this 2007 Act [January 1, 2008] shall complete a school facility plan within two years after the effective date of this 2007 Act. [2007 c.579 §3]
Section: Previous 195.040 195.060 195.065 195.070 195.075 195.080 195.085 195.110 195.115 195.120 195.125 195.137 195.139 195.141 195.143 NextLast modified: August 7, 2008