Robert R. Skorniak and Mary Skorniak - Page 3

                                        - 3 -                                         

          (3405 lot) for the purpose of constructing a house on it.  The              
          3405 lot was located at 3405 13th Place S.E., Salem, and adjoined           
          the 3395 residence.  During 1990, petitioners began construction            
          on the 3405 lot of a 9,000 square foot, two-story house (3405               
          house).  In November 1990, framing contractors, retained by                 
          petitioners, commenced the framing work on the 3405 house.  In              
          addition, petitioners retained the services of their son Donald             
          C. Skorniak and the services of Michael D. Friederick, who                  
          assisted with various construction work on that house, including            
          (1) installing the plumbing; (2) stuccoing the exterior walls;              
          and (3) sheetrocking, taping, texturing, and painting the inter-            
          ior walls and ceilings.                                                     
               As of January 31, 1992, the construction work on the 3405              
          house had not been completed.  That work was not completed until            
          May or June 1992.  Construction work with respect to the interior           
          of the 3405 house that was in progress during January 1992 and/or           
          was not completed by January 31, 1992, included (1) sheetrocking,           
          taping, texturing, and painting the walls and ceilings; (2) in-             
          stalling the flooring, including carpets and tiles; and (3) in-             
          stalling soffits in the recreation room.  Construction work with            
          respect to the exterior of the 3405 house that was not completed            
          by January 31, 1992, included certain unspecified work relating             
          to its outside structure that was done after January 31, 1992,              
          pouring concrete for its front steps that was done during Febru-            