- 4 - ary 1992, pouring concrete for its driveway that was done after February 1992, and installing its garage door that was done during April or May 1992. As of January 31, 1992, utility services, including water and electricity, were not yet furnished to the 3405 house through any public utility company. On February 20, 1992, Portland General Electric connected the electricity service, and on February 22, 1992, the city of Salem connected the water service, to the 3405 house. On May 20, 1992, the city of Salem conducted the final electrical inspection on the 3405 house and approved the electrical wiring in that house. Although Northwest Natural Gas Company connected the gas service to the 3405 house on January 29, 1992, that service was not used by petitioners until some time after January 31, 1992. During 1990, petitioner Robert Skorniak (Mr. Skorniak) connected a number 10-gauge wire from the 3395 residence to the 3405 house in order to provide electricity service to that house, and he connected a water pipe from the 3395 residence to the 3405 house in order to provide water service to that house. The number 10-gauge wire that Mr. Skorniak connected to the 3405 house did not provide adequate power for the entire house and was installed primarily for the purpose of operating power tools during the course of the construction of that house. As of January 31, 1992, the only sources for heating the 3405 housePage: Previous 1 2 3 4 5 6 7 8 9 10 11 12 Next
Last modified: May 25, 2011