Joseph Alan Piole - Page 9




                                        - 9 -                                         
               During 1989, petitioner paid $6,235 to Automatic Door                  
          Enterprises, Inc., for the purchase and installation of an                  
          automatic electric door at the Babcock building.                            
               During 1989, petitioner paid $5,209.21 in cash to Lighting             
          by Erik for the purchase and installation of light fixtures and             
          bulbs at the Babcock building.                                              
               On or about April 19, 1989, petitioner paid $1,700 in cash             
          to John M. Sebbens Painting for work done on the Babcock                    
          building.                                                                   
               During 1989, petitioner paid $7,420 to Russell Construction            
          Co. ($996 by check and $6,424 in cash) for the installation of a            
          wooden deck, a lattice, skylights, and a laundry chute at the               
          Babcock building.                                                           
               During 1989, petitioner paid $4,118 to Alpine Pools for the            
          installation of a hot tub at the Babcock building.  During 1989,            
          petitioner paid an additional $930 to Alpine Pools.                         
               During 1989, petitioner paid $382.12 to Allegheny Millwork &           
          Lumber for the installation of a wooden handrail in the Babcock             
          building.                                                                   
               During 1989, petitioner paid $4,000 to Lentz's Heating and             
          Air Conditioning (Lentz's) for the installation of a furnace at             
          the Babcock building.  During the same year, petitioner paid                
          $813.91 to Lentz's for the installation of an exhaust fan and an            
          outdoor spa at the Babcock building.                                        






Page:  Previous  1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  Next

Last modified: May 25, 2011