- 20 - conduits were added. Qwest’s incremental cost allocation method is described as follows: (1) Qwest allocated to the customer contracts what it determined to be direct costs associated with those contracts; (2) Qwest allocated to its retained assets what it determined to be the direct costs associated with its retained conduits and fibers; and (3) Qwest allocated what it determined to be indirect costs incrementally between the customer contracts and its retained assets. The incremental cost allocation method was used for both the conduit installation projects and the IRU projects, but the method varied slightly. A. Incremental Cost Allocation Method in the Conduit Installation Projects To determine what costs should be allocated to Qwest’s retained conduits in the conduit installation projects, Qwest developed an incremental base rate. By evaluating Qwest’s construction costs, Senior Vice President for Construction Daniel O’Callaghan (Mr. O’Callaghan) and Qwest Assistant Vice President Ronald Pearce (Mr. Pearce) determined that an incremental base rate of $6,019 per conduit mile should be utilized. The incremental base rate included: (1) $2,376 for conduit material, assuming a cost to Qwest of 45 cents per foot; (2) $370 for other material related to installation; (3) $2,640 for labor attributable to the installation of the additional conduit; (4) $581 for equipment costs; and (5) $53 for overhead. ThePage: Previous 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Next
Last modified: May 25, 2011