Sec. 2310.411. WAIVER OF PERFORMANCE BOND. A subcontractor is not required to execute a performance bond under Chapter 2253 if:
(1) the construction, alteration, repair, or other public work to be performed under the contract is entirely in a readjustment zone; and
(2) the amount of the contract does not exceed $200,000.
Added by Acts 1997, 75th Leg., ch. 114, Sec. 1, eff. May 19, 1997.
Section: Previous 2310.306 2310.307 2310.308 2310.401 2310.402 2310.403 2310.404 2310.405 2310.406 2310.407 2310.408 2310.409 2310.410 2310.411 2310.412 NextLast modified: September 28, 2016