Sec. 121.503. REQUIREMENTS OF TEST. (a) The person responsible for a school facility shall perform the pressure test to determine whether the natural gas piping downstream of the school facility's meter holds at least normal operating pressure over a specified period determined by the railroad commission.
(b) During the pressure test, each system supply inlet and outlet in the school facility must be closed.
(c) At the request of a person responsible for a school facility, the railroad commission shall assist the person in developing a procedure for conducting the test.
Added by Acts 1999, 76th Leg., ch. 62, Sec. 18.14(a), eff. Sept. 1, 1999. Amended by Acts 2001, 77th Leg., ch. 1233, Sec. 74, eff. Sept. 1, 2001.
Section: Previous 121.310 121.401 121.402 121.403 121.451 121.452 121.453 121.454 121.5005 121.501 121.502 121.503 121.504 121.505 121.506 NextLast modified: September 28, 2016