Verizon Communications Inc. v. FCC, 535 U.S. 467, 49 (2002)

Page:   Index   Previous  42  43  44  45  46  47  48  49  50  51  52  53  54  55  56  Next

Cite as: 535 U. S. 467 (2002)

Opinion of the Court

covery of certain fixed costs efficiently incurred in the intermediate term.

The most commonly proposed variant of fixed-cost recovery ratesetting is "Ramsey pricing." See Iowa Utilities Bd., supra, at 426-427 (Breyer, J., concurring in part and dissenting in part). Ramsey pricing was originally theorized as a method of discriminatory taxation of commodities to generate revenue with minimal discouragement of desired consumption. Ramsey, A Contribution to the Theory of Taxation, 37 Econ. J. 47, 58-59 (1927). The underlying principle is that goods should be taxed or priced according to demand: taxes or prices should be higher as to goods for which demand is relatively inelastic. K. Train, Optimal Regulation: The Economic Theory of Natural Monopoly 122- 125 (1991). As applied to the local-exchange wholesale market, Ramsey pricing would allow rate recovery of certain costs incurred by an incumbent above marginal cost, costs associated with providing an unbundled network element that are fixed and unavoidable over the intermediate run, typically the 3- or 4-year term of a rate arbitration agreement. The specific mechanism for recovery through wholesale lease rates would be to spread such costs across the different elements to be leased according to the demand for each particular element. First Report and Order ¶ 696. Cf. B. Mitchell & I. Vogelsang, Telecommunications Pricing: Theory and Practice 43-61 (1991). Thus, when demand among entrants for loop elements is high as compared with demand for switch elements, a higher proportion of fixed costs would be added as a premium to the loop-element lease rate than to the switch lease rate.

But this very feature appears to be a drawback when used as a method of setting rates for the wholesale market in unbundled network elements. Because the elements for which demand among entrants will be highest are the costly bottleneck elements, duplication of which is neither likely nor desired, high lease rates for these elements would be

515

Page:   Index   Previous  42  43  44  45  46  47  48  49  50  51  52  53  54  55  56  Next

Last modified: October 4, 2007