Revised Code of Washington - RCW Title 60 Liens - Section 60.24.070 Period covered by stumpage lien

§ 60.24.070. Period covered by stumpage lien

The person granting the privilege mentioned in RCW 60.24.035 is only entitled to the lien as provided therein for saw logs, spars, piles and other timber cut during the eight months next preceding the filing of the claim, as herein provided in RCW 60.24.075.

[1893 c 132 § 6; RRS § 1167. Prior: Code 1881 § 1946; 1877 p 217 § 8.]

Sections:  Previous  60.24.020  60.24.030  60.24.033  60.24.035  60.24.038  60.24.040  60.24.070  60.24.075  60.24.080  60.24.100  60.24.110  60.24.120  60.24.130  60.24.140  60.24.150  Next

Last modified: April 7, 2009