§ 60.24.150. Enforcement against all or part of property
Any person who shall bring a civil action to enforce the lien herein provided for, or any person having a lien as herein provided for, who shall be made a party to any such civil action, has the right to demand that such lien be enforced against the whole or any part of the saw logs, spars, piles or other timber or manufactured lumber or shingles upon which he has performed labor or which he has assisted in securing or obtaining, or which he has cut on his timber land during the eight months next preceding the filing of his lien, for all his labor upon or for all his assistance in obtaining or securing said logs, spars, piles or other timber, or in manufacturing said lumber or shingles during the whole or any part of the eight months mentioned in *section seven (7) of this act, or for timber cut during the whole or any part of the eight months above mentioned. And where proceedings are commenced against any lot of saw logs, spars, piles or other timber or lumber or shingles as herein provided, and some of the lienors claim liens against the specific logs, spars, piles or other timber or lumber or shingles proceeded against, and others against the same generally, to secure their claims for work and labor, the priority of the liens shall be determined as hereinbefore provided.
[1893 c 132 § 14; RRS § 1175. Prior: Code 1881 § 1952; 1877 p 218 § 14.]
Notes:
*Reviser's note: "section seven (7) of this act" is codified as RCW 60.24.075. Section 5 (codified as RCW 60.24.040) was probably intended.
Sections: Previous 60.24.070 60.24.075 60.24.080 60.24.100 60.24.110 60.24.120 60.24.130 60.24.140 60.24.150 60.24.160 60.24.170 60.24.180 60.24.190 60.24.195 60.24.200 Next
Last modified: April 7, 2009