Revised Code of Washington - RCW Title 47 Public Highways And Transportation - Section 47.60.345 Life-cycle cost model on capital assets

§ 47.60.345. Life-cycle cost model on capital assets

(1) The department shall maintain a life-cycle cost model on capital assets such that:

(a) Available industry standards are used for estimating the life of an asset, and department-adopted standard life cycles derived from the experience of similar public and private entities are used when industry standards are not available;

(b) Standard estimated life is adjusted for asset condition when inspections are made;

(c) It does not include utilities or other systems that are not replaced on a standard life cycle; and

(d) It does not include assets not yet built.

(2) All assets in the life-cycle cost model must be inspected and updated in the life-cycle cost model for asset condition at least every three years.

(3) The life-cycle cost model shall be used when estimating future terminal and vessel preservation needs.

(4) The life-cycle cost model shall be the basis for developing the budget request for terminal and vessel preservation funding.

[2008 c 124 § 4; 2007 c 512 § 10.]

Notes:
     Finding -- Intent -- 2007 c 512: See note following RCW 47.06.140.

Sections:  Previous  47.60.300  47.60.310  47.60.315  47.60.327  47.60.330  47.60.335  47.60.340  47.60.345  47.60.355  47.60.365  47.60.375  47.60.377  47.60.385  47.60.395  47.60.400  Next

Last modified: April 7, 2009