§ 47.60.375. Capital plan
(1) The capital plan must adhere to the following:
(a) A current ridership demand forecast;
(b) Vehicle level of service standards as described in RCW 47.06.140;
(c) Operational strategies as described in RCW 47.60.327; and
(d) Terminal design standards as described in RCW 47.60.365.
(2) The capital plan must include the following:
(a) A current vessel preservation plan;
(b) A current systemwide vessel rebuild and replacement plan;
(c) A current vessel deployment plan; and
(d) A current terminal preservation plan.
[2008 c 124 § 3; 2007 c 512 § 13.]